General Requirements and Policies
It shall be the responsibility of the permit holder or the permit holder's representative to notify the building department when the stages of construction requiring inspection are reached.

A minimum 24 hours notice is required for all inspection requests. Inspections will be performed within two working days.

Be ready for the inspection when it is requested.

Failure to cancel an inspection by 8:30am on the day the inspection is requested may result in re-inspection fees being assessed.

Failure to request any inspection will require the removal of any concealing materials to determine code compliance and will likely lead to sanctions against the contractor(s) responsible.

Inspections will not be conducted unless the building permit card is posted conspicuously on site.

Minimum Required Inspections

  1. Footings:
    Bottom of excavated footing trenches, after all reinforcement steel is set, and the bottom of all pier, post, or column footings before any concrete is placed. Also, any graded areas prepared for concrete prior to floor placement.

  2. Foundation:
    Foundation wall and piling systems after anchor bolts or approved anchoring straps are installed, and supporting piers have been capped with 4 inches of solid masonry or solidly grouted. Mechanically-driven pilings shall be inspected at the time of their driving. Basement dampproofing, waterproofing and drainage systems must be inspected and verified prior to backfilling.

  3. Exterior Sheathing Fastening:
    Structural exterior wall and roof sheathing fastening, prior to covering with any concealing materials.

  4. Framing, Rough Plumbing, Rough Mechanical, Rough Electrical:
    All structural framing and fasteners, prior to covering with concealing materials. All rough-in plumbing is to be completed and pressure-tested in the inspector's presence. All concealed mechanical installations shall be inspected prior to covering.

    A rough-in wiring inspection must have been conducted and approved by the electrical inspector. This inspection is conducted through Middle Department Inspection Agency whose inspector can be reached weekdays 8:00 a.m. to 9:00 a.m. at (757) 665-6260.

  5. Energy Code Compliance:
    Insulation of exterior walls, and any other energy conserving materials, prior to covering.

  6. Final:
    Upon completion of the building or structure, prior to the issuance of a Certificate of Occupancy.

 

 

 

 

 

 

 

 

Building, Planning and Zoning Menu
Building, Planning and Zoning Home Page | Amusement Device Inspections
Fire Code Inspections | Building Permits and Code Inspections | Permit Requirements
Required Minimum Inspections | Accomack County Design Loads and Criteria
Wind-Resistant Construction Requirements | Construction in Flood Hazard Zones
Common Reasons for Residential Building Inspection Failures
Wetlands Administration | Erosion and Sediment Control | Chesapeake Bay Preservation Overlay District | Confined Poultry Operation - Application Packet | Additional Resources | FAQ
Comprehensive Plan | Commissions and Boards
Building, Planning and Zoning Home Page


Visitors and Tourists | Resident Services | Business Services
Site Map | Contact Us | Home


Website by Dawson Resources, LLC - Marketing and Business Development.

All rights reserved.

Click here for the calendar.

Contact Information

Building and Zoning
Accomack County
23296 Courthouse Ave.
Accomac, Virginia 23301

Director:
David A. Fluhart
bpz@co.accomack.va.us

8:30 AM to 5:00 PM
Monday through Friday

(757) 787-5721



If you would like to work in this department, please click here to learn if there are Employment Opportunities.