How are projects prioritized?

Print
Press Enter to show all options, press Tab go to next option

The County prioritizes ditch maintenance projects using a variety of factors.  Each project is ranked to determine the priority of the work, using the following criteria:

 

  1. Potential roadway hazard
  2. Potential damage due to flooding (yards, houses, roadways)
  3. Size of drainage area upstream of the ditch (how many people benefit)
  4. Plans for VDOT to clean out their portion
  5. Last time area was serviced

 

Initial workload is organized around the rankings, and then adjusted as each project receives rights-of-entry and the necessary easements to start work.  Logistical issues are also taken into consideration, such as time of year, amount of recent rainfall and crop planting seasons

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Flash Player Download Flash Player Windows Media Player Download Windows Media Player Microsoft Silverlight Download Microsoft Silverlight Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer